Commercial
Orion City Development
Colombo • Completed In Service (Client Since 2015)
Client
Orion City Development
Location
Colombo
Project Type
Commercial Corporate Office Development
Floors Served
Up to 5 Floors (Multiple Buildings)
Elevators
4 Lifts Total (Latest: Duplex 5-Stop Lift System)
Completed
In Service (Client Since 2015)
The Challenge
Custom Vertical Transportation for a Growing Tech & Corporate Park
As a premier corporate hub, Orion City Development required modern, scalable, and highly reliable vertical transit across its office complex. The primary challenge involved retrofitting and upgrading elevator systems within a modernized building, requiring tailored engineering solutions spanning every aspect of the shaft — from pit technical modifications all the way to rooftop machine rooms — without disrupting ongoing operations.
Our Solution
Tailored Duplex Elevator System & Full-Building Modernization
Building on a partnership established in 2015, our team engineered and installed a sophisticated duplex 5-stop elevator configuration. The solution delivered complete customization across the entire vertical structure — from pit depth optimization to rooftop shaft integration. This high-efficiency setup brings total installations for the client to 4 lifts, providing seamless inter-floor transit and modern aesthetics for their corporate tenants.
Execution Blueprint
Process & Technical Execution
01
Facility & Infrastructure Assessment
Evaluation of existing shaft dimensions and corporate traffic patterns to plan duplex integration
02
End-to-End Custom Engineering
Precision design covering specialized shaft pit adjustments up to rooftop equipment housing
03
Duplex System Supply & Installation
Synchronized deployment of the 5-stop duplex elevator system to streamline traffic distribution
04
Testing, Synchronization & Handoff
Ride quality tuning, dual-car dispatch optimization, and safety verification for full commercial launch
Performance Metrics
Results & Impact
4 Total Lifts Delivered
Multi-stage vertical transportation deployment completed for Orion City Development across a long-term partnership.
Optimized Duplex Traffic Flow
Advanced 5-stop duplex technology reduces passenger wait times across corporate office floors.
Custom Pit-to-Rooftop Integration
Seamless structural adaptation tailored specifically to the upgraded building parameters.
10+ Years of Corporate Partnership
Ongoing client trust built on reliable, high-performance elevator solutions since 2015.
Have a similar project in mind?
Contact our structural consultants and elevator engineers today to map out a custom high-performance blueprint for your architecture.